logo
Turn your spec into bid-ready evidence in 72 hours

Done-for-you sprint: citations + 2 JHAs.

NextBid.ai dashboard showing cited requirements and JHA tables
Live Demo
≤60s
First rows after upload
95%+
rows with clause + page reference
2 JHAs
delivered by Day 3
72-hour Sprint: $6,500Enterprise Sub from $1,000/moSee pricing & ROI

Low-liability outputs: cited extracts and structured safety tables. Auditable = adoptable.

Customer testimonials

Trusted by Top Contractors, Estimators, Safety Professionals & Senior Executives

7,000+Specs Analyzed
96%Clause Coverage
100,000+Hours Saved

“We cut review time in half and walked into pricing with citations ready.”

Pre-Con Director

US DOT contractor

First pass exports landed in the estimating room within hours.

“Toolbox cards with WHS citations were ready before mobilization.”

HSE Manager

Tier 2 builder, ANZ

Supervisors signed off faster because every control had WHS references.

“Execs greenlit the bid once they saw the coverage stats and audit trail.”

VP, Strategic Pursuits

Global infrastructure JV

Outcome Proof slide made the go/no-go meeting 15 minutes shorter.

3 Core Modules
Building Bid Readiness
Every module delivers cited, auditable outputs that your team can trust.
RFP Analyzer

Extracts requirements, penalties, and key dates with clause + page on every row.

Cuts clause hunting time by 70%+.

JHA/JSA Generator

Task → Hazard → Control mapped to OSHA/WHS with citations on each row.

Toolbox-ready in hours.

Research Assistant (Safety & Standards)

Cited answers with jurisdiction toggles for US and ANZ standards.

Faster, defensible clarifications.

Proof: cited outputs you can defend

Every row carries clause + page; links open the source page.

Requirements table — 180–250 rows typical; each has clause + page reference

🟢 US DOT sample
RequirementClausePageCategory
Submit baseline CPM schedule within 10 days of NTPSection 01 32 16 — 2.1Page 38Scheduling
Provide certified traffic control plan prior to lane closuresSection 01 55 26 — 3.2Page 52Traffic
Submit stormwater pollution prevention plan meeting EPA NE requirementsSection 01 57 19 — 1.3Page 61Environmental
Transmit daily progress reports with labor/equipment logs by 0900 next daySection 01 31 19 — 4.1Page 44Reporting
Submit SDS for hazardous materials per OSHA HCS before onsite deliverySection 01 35 29 — 2.4Page 49Safety
View full sample pack →

Includes CSV + DOCX exports (public data, identifiers redacted).

Submittal register (Division 01 + referenced sections)

Trigger events, due-relative dates, responsible party, reviewer. Each row links back to the source clause.

ItemTriggerDueResponsibleReviewer
Project ScheduleNotice to Proceed10 days afterProject ManagerOwner’s Rep
Traffic Management PlanPre-construction Meeting5 days before mobilizationTraffic ManagerDOT Safety
Environmental Management PlanContract Award15 days afterEnvironmental OfficerEPA Liaison

AHA / JHA outputs — OSHA + WHS citations

Delivered as one-page DOCX and toolbox card. Standards citations locked to each hazard/control pair.

Road excavation — trenching

Hazards

Trench collapse, underground utilities, struck-by traffic

Controls

Engineered shoring, utility locates, spotters, MUTCD traffic plan

Bridge works at height

Hazards

Falls from edge, falling objects, weather exposure

Controls

Harness & SRL tie-off, debris nets, wind/heat index checks

Open sample workspace

Upload access after a 20-minute Outcome Plan call (72-hour sandbox).

Frequently Asked Questions

Kick off today and get deliverables within 72 hours.

Book a 15-minute call to scope your spec, confirm deliverables, and lock in dates.

No integrations requiredSOC 2 • ISO 2700195%+ clause coverage