Done-for-you sprint: citations + 2 JHAs.

✓Low-liability outputs: cited extracts and structured safety tables. Auditable = adoptable.
Trusted by Top Contractors, Estimators, Safety Professionals & Senior Executives
“We cut review time in half and walked into pricing with citations ready.”
Pre-Con Director
US DOT contractor
First pass exports landed in the estimating room within hours.
“Toolbox cards with WHS citations were ready before mobilization.”
HSE Manager
Tier 2 builder, ANZ
Supervisors signed off faster because every control had WHS references.
“Execs greenlit the bid once they saw the coverage stats and audit trail.”
VP, Strategic Pursuits
Global infrastructure JV
Outcome Proof slide made the go/no-go meeting 15 minutes shorter.
Extracts requirements, penalties, and key dates with clause + page on every row.
Cuts clause hunting time by 70%+.
Task → Hazard → Control mapped to OSHA/WHS with citations on each row.
Toolbox-ready in hours.
Cited answers with jurisdiction toggles for US and ANZ standards.
Faster, defensible clarifications.
Proof: cited outputs you can defend
Every row carries clause + page; links open the source page.
Requirements table — 180–250 rows typical; each has clause + page reference
🟢 US DOT sample| Requirement | Clause | Page | Category |
|---|---|---|---|
| Submit baseline CPM schedule within 10 days of NTP | Section 01 32 16 — 2.1 | Page 38 | Scheduling |
| Provide certified traffic control plan prior to lane closures | Section 01 55 26 — 3.2 | Page 52 | Traffic |
| Submit stormwater pollution prevention plan meeting EPA NE requirements | Section 01 57 19 — 1.3 | Page 61 | Environmental |
| Transmit daily progress reports with labor/equipment logs by 0900 next day | Section 01 31 19 — 4.1 | Page 44 | Reporting |
| Submit SDS for hazardous materials per OSHA HCS before onsite delivery | Section 01 35 29 — 2.4 | Page 49 | Safety |
Includes CSV + DOCX exports (public data, identifiers redacted).
Submittal register (Division 01 + referenced sections)
Trigger events, due-relative dates, responsible party, reviewer. Each row links back to the source clause.
| Item | Trigger | Due | Responsible | Reviewer |
|---|---|---|---|---|
| Project Schedule | Notice to Proceed | 10 days after | Project Manager | Owner’s Rep |
| Traffic Management Plan | Pre-construction Meeting | 5 days before mobilization | Traffic Manager | DOT Safety |
| Environmental Management Plan | Contract Award | 15 days after | Environmental Officer | EPA Liaison |
AHA / JHA outputs — OSHA + WHS citations
Delivered as one-page DOCX and toolbox card. Standards citations locked to each hazard/control pair.
Road excavation — trenching
Hazards
Trench collapse, underground utilities, struck-by traffic
Controls
Engineered shoring, utility locates, spotters, MUTCD traffic plan
Bridge works at height
Hazards
Falls from edge, falling objects, weather exposure
Controls
Harness & SRL tie-off, debris nets, wind/heat index checks
Upload access after a 20-minute Outcome Plan call (72-hour sandbox).
Frequently Asked Questions
Kick off today and get deliverables within 72 hours.
Book a 15-minute call to scope your spec, confirm deliverables, and lock in dates.